Aluminum Extrusion 6063 Scrap
Tags: Non-Ferrous Scrap
Aluminium Scrap
Describe some quality or feature of the company. Write a short paragraph about it and choose an appropriate icon.
Copper Scrap
Describe some quality or feature of the company. Write a short paragraph about it and choose an appropriate icon.
Lead Scrap
Describe some quality or feature of the company. Write a short paragraph about it and choose an appropriate icon.
Description
Aluminum Extrusion 6063 Scrap. It is the most common alloy used for aluminum extrusions. Normally, Aluminium Extrusion 6063 Scrap shall consist of clean aluminum profile extrusions including window, shop fittings, irrigation tubes and door frames. However, it must be free of screws, iron components, plastics, rubber or other foreign materials.
Chemical composition· Silicon minimum 0.2%, maximum 0.6% by weight
· Iron no minimum, maximum 0.35%
· Copper no minimum, maximum 0.10%
· Manganese no minimum, maximum 0.10%
· Magnesium minimum 0.45%, maximum 0.95%
· Chromium no minimum, maximum 0.10%
· Zinc no minimum, maximum 0.10%
· Titanium no minimum, maximum 0.10%
· Other elements no more than 0.05% each, 0.15% total
ELEMENT | 6063 % PRESENT |
---|---|
Si | 0.2 to 0.60 |
Fe | 0.0 to 0.35 |
Cu | 0.0 to 0.10 |
Mn | 0.0 to 0.10 |
Mg | 0.45 to 0.9 |
Zn | 5.8-6m |
Ti | 0.0 to 0.1 |
Cr | 0.1 max |
Al | Remainder |
Specifications
1. Alloy: 6063-T5/T6
2. Length: 3-6.5 m
3. Normal anodizing thickness: 8 to 12 micro
4. Normal powder coating thickness: 60 – 100 micro
5. Tensile Strength: ≥160 MPa
6. Yield strength: ≥110 MPa
7. Extensibility: ≥8%
8. Hardness (HW): ≥8
Typical Applications;
• Architectural and building products
• Door and window frames
• Electrical components and conduit
• Railings and furniture
• Pipe and tube for irrigation systems
• Heatsinks etc
Product name: Aluminum Scrap
Al(min): 97%-99.9%
Color: Silver / Black
Packing: 50kgs/bale, 50kgs/bundle / 50kgs/bag, 1000kgs/bag
Minimum Order Quantity: 100 Metric Tons
Place of Origin: United Kingdom
Origin Port: Port of Felixstowe
Loading / Packing time: 5-10 days